The days are hot and long, and the work is grueling, but this project is getting closer and closer to completion. Things still look pretty hectic, but if you look closely, most of the big things are done. We should be done by the second or third week of August, just in time for the fall market.

(I apologize for the poor image quality, it will be fixed in time for the next post)

The front metalwork is nearly complete. All that's left is the front right side and the trim piece beneath the front balcony.


The back patio is fully poured, and work is underway on the fence. They should be done by the end of this weekend.


The tiling is really moving along. Here is the marble basketweave in the stand-up showers.


The built in cabinets are installed on the top two floors. Red House Staging came by today and helped me choose a really cool-looking Porcelenosa tile for the fireplace surround.


In the basement, the cabinets went in and were finished today. The countertop company is coming Monday to measure for the Silestone Quartz tops.