Here's the rear addition from the alley. |
The rear level of unit 2 has tons of light. |
Most of the units in the building are in this condition. They are all framed, but we're waiting to finish the roof to run any electric, mechanical or plumbing. The goal is to start early next week. |
The two-level rear unit is huge- almost 1250 SF. |
![]() |
Framing out the final floor. |
The sunny weather yesterday was incredible, especially after all the rain the day before. |
![]() |
The homepage is clean and well-organized. |
![]() |
Another new feature is the ability to check availability, view floorplans and get building details without having to go to an external website. |
![]() |
We also were able to incorporate the Walk Score app into each project page. On that note, our lowest Walk Score of any project is 86, which happens to be one block from Columbia Heights. |
![]() |
Another useful feature is a well-organized portfolio, which is sorted into various categories (like kitchens, baths, etc.) |
The little machine can maneuver in small spaces and removes the dirt close to the building. The bigger machine then scoops it up and puts it into a waiting dump truck. |
![]() |
This island is very basic and could easily be used as a dining room table. |
![]() |
This island looks permanent, but it can actually be moved if needed. |
![]() |
This island is made from an old dining room table that was re-purposed. |
The ceiling height in the basement is great. You can see in this picture that the 8 foot tall bobcat fits with no problem. |
The masons are busy repairing the brick so the floor can be attached to the wall. |
After the brick is repaired, the new floors are bolted to the wall and look like the picture above. Here, a carpenter is putting joist hangers on each joist to make them sturdy. |
The front of the building is unchanged and won't look much different for several months until we replace the front steps and paint the front. |
Inside pretty much looks like a tornado came through the house. To the right center you can see the old chimney shaft. We took the fireplace down to reuse again in the new units. |
Here's one of the old fireplaces. |
In the rear, the masons worked to put back a piece of the fencing between our house and the apartment building next door. |
The basement is finally starting to get cleaned out. All of the debris on the ground is shetrock that was pulled down today and put in the dumpster at the end of the day. |