Tuesday, August 23, 2011

1449 Harvard St NW- Framing



We have all of our attention focused on framing the building at 1449 Harvard St NW. We're also working hard to finalize the name for the building. We should have it settled by the end of this week. In the mean time, our masons and carpenters are busy getting in the new floors and repairing the old ones.

The ceiling height in the basement is great.  You can see in this picture that the 8 foot tall bobcat fits with no problem.

The masons are busy repairing the brick so the floor can be attached to the wall.

After the brick is repaired, the new floors are bolted to the wall and look like the picture above.  Here, a carpenter is putting joist hangers on each joist to make them sturdy.



No comments:

Post a Comment

 

© 2010. All Rights Reserved. | Custom Blog Design By Penny Lane Designs