The plumbing is roughed-in in the bottom three units. |
The masons shifted their focus today from the roof to the back wall in order to give the framers time to put in the next set of floor joists. |
All that's left to go on the top of the building is the mezzanine part of the top unit. Plus the roof deck. |
The back is all retained and the two parking spots are leveled off at the top. We're going to pour the concrete and build the steps at the beginning of next month. |
Upstairs, the framers were installing the final set of floor joists. |
The space above these guys is actually the floor of the outdoor terrace off the mezzanine. The LVL in the background is for the base of the spiral steps to access the roof deck. |