Wednesday, March 16, 2011

Construction Progress- The Gracie at 1470 Chapin Rd

Done! Well, 99.9%. The stagers finished their design on monday and the photographer came through yesterday. Her pictures are incredible! She does a great job of capturing all of the natural light in these units. All that's left to do at the project is clean (again), finish the front railings and pour the concrete for the small walkway between the parking and the back of the building. Can't wait to get feedback from our first open house this Sunday from 1-4.


The front is pretty much all done.  The front handrail when in just after we took this picture.
 .

The bedrooms have so much light from the huge patio doors.

The penthouse kitchen looks like something straight out of a design magazine.

The steps worked out perfectly.

The stagers did a great job with the layout here.

This is the picture that we chose for the cover of all the marketing materials.

We staged the loft as a bedroom but it could also be used as an office or entertaining space.

The rooftop deck needs one more coat of stain.

Here is the dining area in unit 3.

The exposed brick looks great with the floor color.

More great entertaining space.

Here's the view over the island.