Last week, we filled in the basement with gravel and ran the new plumbing. |
We ordered a pump truck to pump the concrete from the street down into the basement. |
The concrete is wet and heavy when it is first poured. After several hours of leveling it and smoothing it over, it forms a solid floor. |
After the basement slab was poured, we framed the first floor. |
This weekend, the masons returned to build the block walls up to the second level. |