Thursday, January 20, 2011

Construction Progress- The Gracie

The Gracie project is moving forward rapidly, even ahead of schedule.  We've been slowed down by the weather, but for the most part no major delays.  Last year we lost almost two weeks of work with all the snow, so it's nice to be able to work without interruption.  This week, the sheetrock guys are working in the house and the brick guys are repointing the brick in the front of the building.  Tomorrow, we're going to start on the rear decks.

We moved the scaffolding from the rear to the front.  Today, our excavator came with the Bobcat to remove all of the dirt and bricks from the rear so we can start on the decks.

Here's the first floor kitchen.  Pretty amazing how fast the sheetrock goes up.

Here's the third floor kitchen and living room.  The exposed brick was cleaned but still needs some repointing.

This is the basement before cleaning.  It looks like a hurricane came through.