Tuesday, March 23, 2010

1221 12th St NW- Light

We finally got the lights installed in the top two units this morning. Until this point, only the basement unit had power because the breakers weren't in the panels in the top three units. It's amazing how nice everything looks when the lights are turned on.

Here is the top unit. It's funny how small the electrician looks with the towering ceilings.


The cabinets are being installed in every floor. Here is the progress on the second floor.


Out back, today we removed the old concrete pad. It was in bad shape and didn't cover the whole parking area.


The fence on the side of the property is almost complete. If you look in the left corner you can see the lattice, which is going on top.