Saturday, March 6, 2010

1221 12th St- Getting Closer

The 1221 Condos are really looking good. The weather has started to warm up and we've finally been able to work outside. We're working full speed ahead and should be finished during the second week of April.

The entire house is sheetrocked. Inside, we're still sanding down the sheetrock and we will prime the walls with paint next week.





The big project of the week is the rear decks. The bottom two decks are finished. The welder is coming back monday to extend the posts up to the third floor, and then that deck will go in on Tuesday. Once we pour the concrete, the welder will build the spiral steps.







No comments:

Post a Comment

 

© 2010. All Rights Reserved. | Custom Blog Design By Penny Lane Designs