The upstairs unit is all framed and the plumbers were working here today. The ceilings are at least 16 ft tall in the main living area.
The new steps are installed and are a straight shot up from the front door, which was the best layout to maximize the space.
Throughout the house, masons are working to repoint the brick, which will be exposed.
Here's the bathroom and master closet in the first floor. Lots of wood!
At the rear of each unit, the walls are all framed out for the new windows and patio doors. We're waiting to knock out the brick until the doors come in from the manufacturer.