Tuesday, January 12, 2010

1221 12th st NW- Progress

Things are really moving along at 1221 12th st and we're on track to finish in March- April. The condos look really awesome and have a great mix of historical elements and new features. At this point, we've got about half of the mechanical and plumbing rough-in work done, and hope to start electric later this week. Next week, we will tackle the basement, and insulate the rest of the house. I'd like to have the sheetrock up by the end of the month.

The upstairs unit is all framed and the plumbers were working here today. The ceilings are at least 16 ft tall in the main living area.




The new steps are installed and are a straight shot up from the front door, which was the best layout to maximize the space.



Throughout the house, masons are working to repoint the brick, which will be exposed.



Here's the bathroom and master closet in the first floor. Lots of wood!



At the rear of each unit, the walls are all framed out for the new windows and patio doors. We're waiting to knock out the brick until the doors come in from the manufacturer.

No comments:

Post a Comment

 

© 2010. All Rights Reserved. | Custom Blog Design By Penny Lane Designs